


PROGRAM: RETAIL
SIZE: 40,000 m2
COST: CONFIDENTIAL
STATUS: ON GOING (2021)
TEAM: Joaquin Vaquero, Begoña de Andrés, Christian Alvarez (PL), Sandra Carrasco, Cristina Gasset, Christian Maier,
Nelson Palma, Laura Vásquez, Marina Villalobos
The renovation of the Shopping centre is based on the following key points:
Two building entrances, one located at the main facade and another close to the Metro station.
Provide an efficient user route on the first level through a race-track mall.
Increase retail area by adding anchor units on the second floor.
Create good visual links between both levels due to double height spaces.
Standardized facade systems are put in place to optimize costs and timing dew to commitments with the client.
















PROGRAM: RETAIL
SIZE: 40,000 m2
STATUS: ON GOING (2021)
TEAM: Joaquin Vaquero, Begoña de Andrés, Christian Álvarez (PL), Sandra Carrasco, Cristina Gasset, Christian Maier, Nelson Palma, Laura Vásquez, Marina Villalobos
The reconstruction of the Shopping centre is based on the following key issues:
Two building entrances, one located at the main facade and another close to the Metro station. Provide an efficient user route on the first level through a race-track mall. Increase retail area by adding anchor units on the second floor. Create good visual links between both levels due to double height spaces.












